Quantcast
Viewing all articles
Browse latest Browse all 18013

Re: Premiere CC and Encore CS6

This is very disturbing to my workflow.

 

I make videos of operas. My clients want their operas on DVD. Unfortunately all my efforts to get them to consider Blu-Ray have failed. I sell 1 Blu-Ray to every 20 DVDs.

 

The problem: Operas are LONG. They run 1:45 (short like LA BOHEME) - 2:15 (moderate like FAUST) hours (obviously without the intermissions).

 

Anything much longer and I'm putting the opera on 2 discs. So far I've found burning to dual-layer DVD is not economic (the blanks are costly and unreliable and the failure rate is high; plus it takes three times as long to burn).

 

So I've relied on the Dynamic Link to do "bit-budgeting", which it does decently.

 

No Dynamic Link, no bit budgeting which means I have to play with the settings in Media Encoder, adding much time and effort to my work flow. ADOBE STOLE THAT TIME FROM ME. How difficult would it be to put Dynamic Link from PPro CC to Encore CS6? I'm not carping about not updating Encore. I just want my Dynamic Link back since Encore had an intelligence I don't want to have to develop about how to apportion the data on these discs.

 

I also feel that they did this sneaky. I feel cheated. Anyone disagree?

 

Jay


Viewing all articles
Browse latest Browse all 18013

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>